Jadwal Kategori Pelatihan Operation and Maintenance : Mechanical and Electrical Engineering 2025
Pelatihan Public dengan Kategori Training Operation and Maintenance : Mechanical and Electrical Engineering Bandung 2025.
Pelatihan ini terbuka untuk Umum sesuai dengan jadwal yang telah kami sediakan. Pelaksanaan pelatihan secara Offline (di dalam kelas / tatap muka) atau Online (Zoom Meeting).
Dibawah ini adalah jadwal untuk Pelatihan Public dengan Kategori Operation and Maintenance : Mechanical and Electrical Engineering 2025
Kategori | Training Topics | topik | Days | Jan | Feb | Mar | Apr | Mei | Jun | Jul | Aug | Sep | Okt | Nov | Des | Online | Offline | Venue |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Operation And Maintenance : Mechanical And Electrical Engineering | Pompa dan Kompressor : Operasi | Pompa dan Kompressor : Operasi, Perawatan dan Troubleshooting | 4 | 7 - 10 | 4 - 7 | 4 - 7 | 8 - 11 | 6 - 9 | 3 - 6 | 1 - 4 | 5 - 8 | 1 - 4 | 7 - 10 | 4 - 7 | 2 - 5 | 5.000.000 | 7.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | Analisis Getaran Dalam Perawatan Rotary Equipment | Analisis Getaran Dalam Perawatan Rotary Equipment | 4 | 14 - 17 | 11 - 14 | 11 - 14 | 14 - 17 | 13 - 16 | 10 - 13 | 8 - 11 | 12 - 15 | 9 - 12 | 14 - 17 | 11 - 14 | 9 - 12 | 5.000.000 | 7.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | Generator : Operation | Generator : Operation, Troubleshooting and Maintenance | 4 | 21 - 24 | 18 - 21 | 18 - 21 | 22 - 25 | 20 - 23 | 17 - 20 | 15 - 18 | 19 - 22 | 16 - 19 | 21 -24 | 18 - 21 | 16 - 19 | 5.000.000 | 7.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | Trafo : Principles | Trafo : Principles, Application and Maintenance | 4 | 7 - 10 | 25 - 28 | 25 - 28 | 8 - 11 | 6 - 9 | 23 26 | 22 - 25 | 26 - 29 | 23 - 26 | 28 - 31 | 25 - 28 | 2 - 5 | 5.000.000 | 7.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | Operasi dan Pemeliharaan Turbin Gas dan Generator | Operasi dan Pemeliharaan Turbin Gas dan Generator | 4 | 7 - 10 | 4 - 7 | 4 - 7 | 8 - 11 | 6 - 9 | 3 - 6 | 1 - 4 | 5 - 8 | 1 - 4 | 7 - 10 | 4 - 7 | 2 - 5 | 5.000.000 | 7.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | Pengoperasian | Pengoperasian ,Pemeliharaan dan Trouble Shooting Governor PLTA | 4 | 14 - 17 | 11 - 14 | 11 - 14 | 14 - 17 | 13 - 16 | 10 - 13 | 8 - 11 | 12 - 15 | 9 - 12 | 14 - 17 | 11 - 14 | 9 - 12 | 5.000.000 | 7.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | Trouble Shooting Turbin air | Troubleshooting Turbin Air | 4 | 21 - 24 | 18 - 21 | 18 - 21 | 22 - 25 | 20 - 23 | 17 - 20 | 15 - 18 | 19 - 22 | 16 - 19 | 21 -24 | 18 - 21 | 16 - 19 | 5.000.000 | 7.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | Piping and Pipeline System | Piping and Pipeline System | 4 | 7 - 10 | 25 - 28 | 25 - 28 | 8 - 11 | 6 - 9 | 23 26 | 22 - 25 | 26 - 29 | 23 - 26 | 28 - 31 | 25 - 28 | 2 - 5 | 5.000.000 | 7.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | First Line Maintenance (FLM) | First Line Maintenance (FLM) | 3 | 7 - 9 | 4 - 6 | 4 - 6 | 8 - 10 | 6 - 8 | 3 - 5 | 1 - 3 | 5 - 7 | 2 - 4 | 1 - 3 | 4 - 6 | 2 - 4 | 4.500.000 | 6.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | Konversi Energi | Konversi Energi | 3 | 14 - 16 | 11 - 13 | 11 - 13 | 15 - 17 | 13 - 15 | 10 - 12 | 8 - 10 | 12 - 14 | 9 - 11 | 7 - 9 | 11 - 13 | 9 - 11 | 4.500.000 | 6.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | Outage Management | Outage Management | 3 | 21 - 23 | 18 - 20 | 18 - 20 | 22 - 24 | 20 - 22 | 17 - 19 | 15 - 17 | 19 - 21 | 16 - 18 | 14 - 16 | 18 - 20 | 16 - 18 | 4.500.000 | 6.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | Basic Electrical & Mechanical | Basic Electrical & Mechanical | 3 | 7 - 9 | 25 - 27 | 25 - 27 | 28 - 30 | 26 - 28 | 24 - 26 | 22 - 24 | 26 - 28 | 23 - 25 | 21 - 23 | 25 - 27 | 22 - 24 | 4.500.000 | 6.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | Material Knowledge | Material Knowledge | 3 | 7 - 9 | 4 - 6 | 4 - 6 | 8 - 10 | 6 - 8 | 3 - 5 | 1 - 3 | 5 - 7 | 2 - 4 | 1 - 3 | 4 - 6 | 2 - 4 | 4.500.000 | 6.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | Bengkel Alat Berat | Bengkel Alat Berat | 4 | 7 - 10 | 4 - 7 | 4 - 7 | 8 - 11 | 6 - 9 | 3 - 6 | 1 - 4 | 5 - 8 | 1 - 4 | 7 - 10 | 4 - 7 | 2 - 5 | 5.000.000 | 7.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | Boiler Water Treatment | Boiler Water Treatment | 4 | 14 - 17 | 11 - 14 | 11 - 14 | 14 - 17 | 13 - 16 | 10 - 13 | 8 - 11 | 12 - 15 | 9 - 12 | 14 - 17 | 11 - 14 | 9 - 12 | 5.000.000 | 7.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | Heavy Equipment Management | Heavy Equipment Management | 4 | 21 - 24 | 18 - 21 | 18 - 21 | 22 - 25 | 20 - 23 | 17 - 20 | 15 - 18 | 19 - 22 | 16 - 19 | 21 -24 | 18 - 21 | 16 - 19 | 5.000.000 | 7.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | Perhitungan BBM dengan metode ASTM dan Gas dengan metode AGA | Perhitungan BBM dengan metode ASTM dan Gas dengan metode AGA | 4 | 7 - 10 | 25 - 28 | 25 - 28 | 8 - 11 | 6 - 9 | 23 26 | 22 - 25 | 26 - 29 | 23 - 26 | 28 - 31 | 25 - 28 | 2 - 5 | 5.000.000 | 7.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | Electrical : Troubleshooting and Maintenance | Electrical : Troubleshooting and Maintenance | 4 | 7 - 10 | 4 - 7 | 4 - 7 | 8 - 11 | 6 - 9 | 3 - 6 | 1 - 4 | 5 - 8 | 1 - 4 | 7 - 10 | 4 - 7 | 2 - 5 | 5.000.000 | 7.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | Electric Motor : Operation | Electric Motor : Operation, Maintenance and Troubleshooting | 4 | 14 - 17 | 11 - 14 | 11 - 14 | 14 - 17 | 13 - 16 | 10 - 13 | 8 - 11 | 12 - 15 | 9 - 12 | 14 - 17 | 11 - 14 | 9 - 12 | 5.000.000 | 7.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | Electrical Calibration | Electrical Calibration | 4 | 21 - 24 | 18 - 21 | 18 - 21 | 22 - 25 | 20 - 23 | 17 - 20 | 15 - 18 | 19 - 22 | 16 - 19 | 21 -24 | 18 - 21 | 16 - 19 | 5.000.000 | 7.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | Sistem kontrol PLTA | Sistem kontrol PLTA | 4 | 7 - 10 | 25 - 28 | 25 - 28 | 8 - 11 | 6 - 9 | 23 26 | 22 - 25 | 26 - 29 | 23 - 26 | 28 - 31 | 25 - 28 | 2 - 5 | 5.000.000 | 7.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | Kalibrasi dan Pemeliharaan Relay Proteksi Generator | Kalibrasi dan Pemeliharaan Relay Proteksi Generator | 4 | 7 - 10 | 4 - 7 | 4 - 7 | 8 - 11 | 6 - 9 | 3 - 6 | 1 - 4 | 5 - 8 | 1 - 4 | 7 - 10 | 4 - 7 | 2 - 5 | 5.000.000 | 7.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | Control Instrument | Control Instrument | 4 | 14 - 17 | 11 - 14 | 11 - 14 | 14 - 17 | 13 - 16 | 10 - 13 | 8 - 11 | 12 - 15 | 9 - 12 | 14 - 17 | 11 - 14 | 9 - 12 | 5.000.000 | 7.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | Basic Mechanical Course (BMC) | Basic Mechanical Course (BMC) | 3 | 7 - 9 | 4 - 6 | 4 - 6 | 8 - 10 | 6 - 8 | 3 - 5 | 1 - 3 | 5 - 7 | 2 - 4 | 1 - 3 | 4 - 6 | 2 - 4 | 4.500.000 | 6.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | Electric Motor And Gearbox | Electric Motor And Gearbox | 3 | 14 - 16 | 11 - 13 | 11 - 13 | 15 - 17 | 13 - 15 | 10 - 12 | 8 - 10 | 12 - 14 | 9 - 11 | 7 - 9 | 11 - 13 | 9 - 11 | 4.500.000 | 6.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | Kalibrasi Alat Ukur Magnetic | Kalibrasi Alat Ukur Magnetic | 3 | 21 - 23 | 18 - 20 | 18 - 20 | 22 - 24 | 20 - 22 | 17 - 19 | 15 - 17 | 19 - 21 | 16 - 18 | 14 - 16 | 18 - 20 | 16 - 18 | 4.500.000 | 6.000.000 | Bandung |
Operation And Maintenance : Mechanical And Electrical Engineering | Piping And Instrumentation Diagram (P&ID) | Piping And Instrumentation Diagram (P&ID) | 3 | 7 - 9 | 25 - 27 | 25 - 27 | 28 - 30 | 26 - 28 | 24 - 26 | 22 - 24 | 26 - 28 | 23 - 25 | 21 - 23 | 25 - 27 | 22 - 24 | 4.500.000 | 6.000.000 | Bandung |